docs: production GA v1.2.0 plan (single-node cut line)
Define production as tagged release + auth prod compose + backup/restore drill + runbook + known limitations. Raft multi-node stays experimental. Task plan for agentic execution in docs/superpowers/plans/.
This commit is contained in:
@@ -60,3 +60,8 @@ Branch: all work merged to `main` only (feature branch removed).
|
||||
- `docs/en/monitoring.md` — health/metrics (raft section)
|
||||
- `CHANGELOG.md` — `[1.2.0] Unreleased` Raft section
|
||||
- README raft status line
|
||||
|
||||
## Production
|
||||
|
||||
- GA plan: `docs/superpowers/plans/2026-07-30-production-ga.md`
|
||||
- GA design: `docs/superpowers/specs/2026-07-30-production-ga-design.md`
|
||||
|
||||
Reference in New Issue
Block a user